/ Home / BUSINESS RESULT / BUSINESS RESULT LIST
 
BUSINESS RESULT

DATE

CUSTOMER

MACHINE

REMARK

2000,1

DAEWOO

B/PLANT 120§©/HR - 1 UNIT
RE-WASHING PLANT - 1 UNIT
WATER TREATMENT SYSTEM
SILO 100,300, - 3 UNIT

KOREA KTX

2000,2

DAEWOO

B/PLANT 180§©/HR -1 UNIT
RE-WASHING PLANT- 1 UNIT
WATER TREATMENT SYSTEM
SILO 100,300, - 3 UNIT

KOREA HIGH WAY

2000,2

SUNIL CONCRETE

B/PLANT 210§©/HR TOWER TYPE
  ( SINGLE S/F MIXER ) - 1UNIT
WATER TREATMENT SYSTEM--1 UNIT
SILO :1000,500,300,--4 UNIT

KOREA

2000,2

KORAE INDUSTRIAL

B/PLANT 210§©/HR SEMI-TOWER
  ( SINGLE S/F MIXER ) - 1UNIT
WATER TREATMENT SYSTEM-1 UNIT
FLY ASH SUPPLYING SYSTEM-2 UNIT

KOREA

2000,3

DONGJIN REMICON

B/PLANT 150§©/HR - 1UNIT
SILO 300TON - 1UNIT

KOREA

2000,3

HYUNDAI

B/PLANT 60§©/HR FORTABLE
SILO 100TON - 1UNIT
CEMENT UNLOADING SYSTEM
80 TON/HR - 1UNIT

NORTH KOREA

2000,3

DAEWOO NIGERIA

B/PLANT 35§©/HR SKIP TYPE
CONTROL & WEIGHING SYSTEM

NIGERIA

 

2000,3

DAEWOO NIGERIA

B/PLANT 90§©/HR SEMI-TOWER
WATER CHILLER(80RT) - 1UNIT
WATER TANK (30,000) - 2UNIT
BAG CEMENT U/LOADER - 1UNIT
SILO 100 - 2UNIT

NIGERIA

2000,12

SUNGAN INDUSTRIA

SILICA PLANT
50TON/HR X 2UNIT
SILO : 700TON X 5 UNIT

KOREA

2000,12

KYEYONG INDUSTRY

B/PLANT 210§©/HR(SEMI-TOWER)
FLY ASH, SLAG SILO-1 UNIT

KOREA

2001, 03

DAEWOO

B/PLANT 210§©/HR(SEMI-TOWER)
REWASHING PLANT -1UNIT
WATER TREATMENT SYSTEM-1 UNIT
SILO 200,300 - 2UNIT

KOREA

2001, 05

WOOSHIN REMICON

B/PLANT 210§©/HR(SEMI-TOWER)
FLY ASH, SLAG EQUIPMENT - 2UNIT

KOREA

2001, 05

SUNGAN INDUSTRIAL

MILL & SEPARATOR SYSTEM-5TON/HR
(MILL & SEPARATOR 5 TON/HR)

KOREA

2001, 02

DAEWOO PHILIPPINES

B/PLANT 60§©/HR PORTABLE TYPE
(HSBP-1000PC)

PHILIPPINES

2001, 05

SHINIL CM

SILICA FUME SUPPLYING SYSTEM
PRE-MIXER GROUP

KOREA

2001, 05

KEDO

WATER TREATMENT SYSTEM - 1 UNIT
BP & SILO & ICE PLANT CONSULTING

KEDO NORTH KOREA

2001, 06

EUGENES REMICON

SLAG SUPPLYING SYSTEM

KOREA

2001, 06

HANIL CEMENT

CEMENT SILO 500 TON-1 UNIT

KOREA

2001, 06

SUNGAN INDUSTRIAL

MILL & CRUSHING SYSTEM
400TON/HR - 1UNIT

KOREA

2001, 06

PHOENIX ELECTIRC

CULLET MIXER (500L - 1 UNIT)

KOREA

2001, 12

JINCHENG RMC

B/PLANT 210§©/HR(SEMI-TOWER)
(500TON - 3UNIT )

BEIJING CHINA

2001, 09

SEOKYUNG REMICON

SLAG SUPPLYING SYSTEM
SILO - 500TON X 1UNIT

KOREA

2001, 09

DEAWOO

B/PLANT REMOVING
120§©/HR X 2UNIT (SILO X 6UNIT )

KOREA

2001, 10

SUNIL CONCRETE

FLY ASH SUPPLYING SYSTEM
SILICA FUME SUPPLYING SYSTEM
PRE-MIXER SUPPLYING SYSTEM

KOREA

2001, 10

DONGYANG INDUSTRIAL

MAGIC-PLATE & BAR PLANT

KOREA

2001, 10

DAEWOO NIGERIA

CAR-MIXER (CX-3500) WEIGHING SYSTEM

NIGERIA

2001, 11

KUMHO

MIXING PLANT (KS-60)

KOREA

2001, 11

SUNIL CONCRETE

SILICA, FLY ASH CAPACITY UPGRADE

KOREA

2001, 11

EUGENES REMICON

SLAG. POWDER SUPPLYING SYSTEM

KOREA

2001, 11

DOOWON C&C

AN ANINFLATING AGENT SILO 30,70TON

KOREA

2001, 11

YOOPUNG REMICON

SAND PLANT(50§©/hr)-1 UNIT
REWASHING & MILL PLANT

KOREA

2002, 01

SUNIL CONCRETE

B/PLANT 210§©/HR
CONVEYOR & STOCK ,WEIGHING SYSTEM

KOREA

2002, 02

KOREA-HIMIX

B/PLANT 210§©/HR
CAPACITY UPGRADE

KOREA

2002, 02

SHINIL CM

B/PLANT 180§©/HR
HIGH POWER & HIGH SPEED MIXER

KOREA

2002, 02

EUGENES REMICON

B/PLANT 180§©/HR (S/TOWER) - 1UNIT
SILO 300 - 1UNIT
(TWIN MIXER, AIR SEALING)

KOREA

2002, 02

ISOON REMICON

B/PLANT 180§©/HR (S/TOWER) - 2UNIT
SILO 300 - 2UNIT
SILO 500 - 2UNIT
(TWIN MIXER, AIR SEALING)

KOREA

2002, 02

CHUNMA CONCRETE

B/PLANT 360§©/HR (S/TOWER)
6.0§©/BATCH HIGH POWER TWIN MIXER
SILO 500

KOREA

2002, 03

YOODUCK REMICON

B/PLANT 180§©/HR (S/TOWER) - 1UNIT
3.0§©/BATCH SPIRAL S/F MIX

KOREA

2002, 04

ùÓÔü-ÔÔù¥(ñ»)

B/PLANT 150§©/HR (S/TOWER)
B/PLANT 210§©/HR (S/TOWER) - 1UNIT
SILO 200,300,500 - 4UNIT

QINHUANGDAO CHINA

2002, 04

DAEWOO LIBYA

B/PLANT 120§©/HR (S/TOWER) - 1UNIT
2.0§©/BATCH SPIRAL S/F MIX
CHILLING PLANT (100RT) - 1 UNIT

WAFA LIBYA

2002, 06

HIMIX REMICON

B/PLANT 210§©/HR (S/TOWER) - 1UNIT
FLY ASH SUPPLYING SYSTEM

KOREA

2002, 04

ISOON REMICON

B/PLANT 180§©/HR
HIGH POWER TWIN MIXER

KOREA

2002, 05

SSANYONG REMICON

FLY ASH SUPPLYING SYSTEM
25TON/HR
SILO : 200 M3 - 1UNIT

KOREA

2002, 09

EUGENES REMICON

B/PLANT 180§©/HR (S/TOWER) - 1UNIT
HIGH POWER TWIN MIXER

KOREA

2002, 11

SUNGSHIN REMICON

B/P UPGRADE

KOREA

2002, 12

DAEWOO NIGERIA

B/PLANT 90§©/HR(S/TOWER)-1 UNIT
(2.0§©/BATCH SPIRAL S/F MIX)
SILO 100 TON - 2 UNIT

NIGERIA

2003, 01

EUGENES REMICON

B/PLANT 210§©/HR (SEMI-TOWER)
(3.0§©/BATCH)- HIGH POWER TWIN MIXER

KOREA

2003, 01

SUNIL CONCRETE

CEMENT SILO 1000 TON
CONVEYER & WEIGHING SYSTEM

KOREA

2003, 02

KOREA INDUSTRIAL

B/PLANT 360§©/HR (SEMI-TOWER)
(6§©/BATCH)- HIGH POWER TWIN MIXER
(AUTO WASHING & AIR SEALING)
- AGG' & SAND STOCK SYSTEM

KOREA

2003, 02

WOORIDOSI REMICON

B/PLANT 210§©/HR (TOWER TYPE)
(3.0§©/BATCH)- HIGH POWER TWIN MIXER
(AUTO WASHING ¹× AIR SEARING)
-AGG' & SAND STOCK SYSTEM

KOREA

2003, 02

SHININ CM

B/P REMODELING
3.0§©/BATCH-HIGH POWER TWIN MIXER

KOREA

2003, 02

CHUNMA CONCRETE

B/PLANT 210§©/HR (SEMI-TOWER)

KOREA

2003, 02

KOREA HIMIX

B/PLANT 210§©/HR
3.0§©/BATCH-HIGH POWER TWIN MIXER
- AUTO WASHING & AIR SEALING

KOREA

2003, 03

HALLA CONCRETE

B/PLANT 210§©/HR(SEMI-TOWER)
SILO : 300,500 - 2UNIT
-HIGH POWER TWIN MIXER
-AIR SEALING TYPE

KOREA

2003, 03

HALLA CONCRETE

B/PLANT 210§©/HR(SEMI-TOWER)
- WEIGHING ,CONVEYER UPGRADE

KOREA

2003, 04

DAEWOO LIBYA

A/P PLANT 150 TON/HR - 1UNIT
BURNER, A/P TANK:30,000 X 6 UNIT
FILLER SILO : 2 UNIT

WAPA LIBYA

2003, 04

NAMSUNG REMICON

SLAG CEMENT SUPPLYING SYSTEM
AIR TRANSPORT : 30 TON/HR X 2 UNIT
WEIGHING SYSTEM UPGRADE

KOREA

2003, 04

DAEWOO GHANA

A/P PLANT 100 TON/HR - 2UNIT
BURNER, A/P TANK: 30,000 X 8 UNIT

GHANA

2003, 05

KOREA INDUSTRIAL

B/PLANT MIXER GROUP(3.0§©)
HIGH POWER TWIN MIXER (A B/P)
-AUTO WASHING & AIR SEALING

KOREA

2003, 07

SANGWOO REMICON

WATER TREATMENT SYSTEM-1 UNIT
- CAPACITY : 50§©/HR
- 3nd TANK : 200 TON

KOREA

2003, 07

HALLA CONCRETE

MIXER TRUCK HOPPER AUTO WASHING SYSTEM

KOREA

2003, 07

SUNIL CONCRETE

B/PLANT MIXER GROUP(3.0§©)
HIGH POWER TWIN MIXER (A,B B/P)
- AUTO WASHING & AIR SEALING

KOREA

2003, 07

HALLA CONCRETE

- CONVEYOR & HOPPER

KOREA

2003, 08

DONGHUN REMICON

B/PLANT MIXER GROUP (3.0§©)
HIGH POWER TWIN MIXER
- AUTO WASHING & AIR SEALING
- MIXER MONITOR (CCD)

KOREA

2004, 02

HANSUNG REMICON

B/PLANT 210§©/HR(SEMI-TOWER)
HIGH POWER TWIN MIXER
AUTO WASHING & AIR SEALING
- MIXER MONITOR (CCD)
-SILO : 300,1000,700 3 UNIT
-WATER TREATMENT SYSTEM-1 UNIT

KOREA

2004, 02

WOOSHIN REMICON

B/PLANT 210§©/HR(SEMI-TOWER)
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2004,01

ASAN REMICON

B/P UPGRADE
HIGH POWER TWIN MIXER
TYPE : TWIN S/F (KYC-3000WJK)
SEALING : AIR SEALING
POWER UNIT : BEVEL POWER(55X2)

KOREA

2004,01

EUGENES REMICON

SLAG CEMENT SUPPLYING SYSTEM
SILO : 700 TON X 2 UNIT
BUCKET ELEVATOR

KOREA

2004,02

ASAN REMICON

B/P UPGRADE
HIGH POWER TWIN MIXER
TYPE : TWIN S/F (KYC-3000WJK)
SEALING : AIR SEALING
POWER UNIT : BEVEL POWER(55X2)

KOREA

2004,03

ASAN REMICON

SLAG SUPPLYING SYSTEM
TYPE : BUCKET ELEVATOR

KOREA

2004,02

SSANGYONG REMICON

B/P UPGRADE
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
- MIXER MONITOR (CCD)

KOREA

2004,02

SSANGYONG REMICON

B/P UPGRADE (90¡æ180)
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
- MIXER MONITOR (CCD)

KOREA

2004,03

SSANGYONG REMICON

B/PLANT 210§©/HR(SEMI-TOWER)
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING

KOREA

2004,03

DONGYANG INDUSTRY

TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2004,03

SSANGYONG REMICON

MIXER MONITORING (CCD)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD

KOREA

2004,02

JINIL C&C

TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2004,03

NAMSUNG REMICON

B/P UPGRADE
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER MONITORING (CCD)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2004,04

DAEWOO LIBYA

B/PLANT 90§©/HR(S/TOWER)-1 UNIT
(1.5§©/BATCH SPIRAL S/F MIX)
SILO 100 TON - 2 UNIT

LIBYA

2004,05

DONGCHUN I.D.S

DONGCHUN I.D.S
B/PLANT UPGRADE
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(150X2)
MIXER MONITORING (CCD)
-AGG' & SAND STOCK SYSTEM

KOREA

2004,06

SSANGYONG REMICON

NO4 CEMENT SUPPLYING SYSTEM
SILO : 300 TON 1 UNIT
NO4 CEMENT WEIGHING SYSTEM

KOREA

2004,08

SSANGYONG REMICON

CEMENT SILO BUCKET ELEVATOR
GEARED MOTOR EXCHANGE

KOREA

2004,09

EUGENES REMICON

CEMENT SILO 500 TON- 1 UNIT
BUCKET ELEVATOR EXCHANGE

KOREA

2004,09

ISOON REMICON

HIGH POWER TWIN MIXER EXCHANGE
-TWIN S/F(JSM-30RPM)

KOREA

2004,09

SUNIL CONCRETE

SAND WEIGHING SYSTEM
CONVEYOR SYSTEM

KOREA

2004,10

WOOLIM CONCRETE

WATER TREATMENT SYSTEM-1 UNIT

KOREA

2004,12

JEEGU REMICON

B/PLANT 210§©/HR(S/TOWER)-1 UNIT
TYPE : TWIN S/F (HSM-30RPM)
-SILO : 500TON-2 UNIT, 300TON-1 UNIT
-AGG' & SAND STOCK SYSTEM

KOREA

2005,02

ISOON REMICON

SILO BAG FILTER EXCHANGE

KOREA

2005,01

NAMSUNG REMICON

B/P UPGRADE
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER MONITORING (CCD)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2005,02

ISOON REMICON

AD SUPPLYING SYSTEM
-AD TANKS
-ELECTRIC CONTROL SYSTEM

KOREA

2005,02

KOREA HI-MIX

SAND SUPPLYING SYSTEM
NO4 CEMENT SUPPLYING SYSTEM

KOREA

2005,05

SUNIL CONCRETE

B/PLANT 360§©/HR (TOWER TYPE)
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(150X2)
MIXER MONITORING (CCD)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2005,05

SUNIL CONCRETE

B/PLANT 180§©/HR (TOWER TYPE)
TYPE : TWIN S/F (HSM-30RPM)
SEALING : AIR SEALING
POWER UNIT: BEVEL POWER(55X2)
MIXER MONITORING (CCD)
MIXER WASHER : HSMW-1300 X 2
- NOZZLE HEAD : 3(2+1)HEAD
- MIXER MONITOR (CCD)

KOREA

2005,05

SUNIL CONCRETE

AGG & SAND SILO CONVEYER SYS
AGG' & SAND SILO : 1000§© X 5UNIT
CONVEYER LINE : 1100W X 2 LINE

KOREA

2005,02

SSANGYONG REMICON

2005' WINTER REPAIR

KOREA

2005,02

SSANGYONG REMICON

2005' WINTER REPAIR

KOREA

2005,02

SSANGYONG REMICON

2005' WINTER REPAIR

KOREA

2005,02

SSANGYONG REMICON

2005' WINTER REPAIR

KOREA

2005,02

SHINIL CM

B/PLANT 360§©/HR (SEMI-TOWER)
(6§©/BATCH)

KOREA

2005,02

DONGHUN INDUSTRY

B/PLANT MIXER GROUP (3.0§©)
TYPE : TWIN S/F(HSM-30RPM)
- POWER UNIT: BEVEL REDUCER(55X2)
- AUTO WASHING & AIR SEALING
- MIXER MONITOR (CCD)

KOREA

2005,02

CHUNAN REMICON

AD SUPPLYING SYSTEM
-AD TANKS
-ELECTRIC CONTROL SYSTEM

KOREA

2005,02

DOOSAN CONSTRUTION

B/PLANT MIXER GROUP (3.0§©)
TYPE : TWIN S/F(HSM-30RPM)
POWER UNIT: BEVEL REDUCER(55X2)
-AUTO WASHING & AIR SEALING
-MIXER MONITOR (CCD)

KOREA

2005,03

DOOSAN CONSTRUTION

B/PLANT MIXER GROUP (3.0§©)
TYPE : TWIN S/F(HSM-30RPM)
POWER UNIT: BEVEL REDUCER(55X2)
-AUTO WASHING & AIR SEALING
-MIXER MONITOR (CCD)

KOREA

2005,03

DOOSAN CONSTRUTION

B/PLANT MIXER GROUP (3.0§©)
TYPE : TWIN S/F(HSM-30RPM)
POWER UNIT: BEVEL REDUCER(55X2)
-AUTO WASHING & AIR SEALING
-MIXER MONITOR (CCD)

KOREA

2005,04

SSANGYONG REMICON

B/PLANT MIXER GROUP (3.0§©)

KOREA

2005,06

DAEYANG REMICON

B/PLANT MIXER GROUP (3.0§©)
TWIN S/F(HSM-30RPM)MIXER
- CONVEYOR, WEIGHING SYSTEM

KOREA

2005,07

DOOSAN CONSTRUTION

SLAG POWDER SUPPLYING SYSTEM

KOREA

2005,09

YUDUCK REMICON

FLY-ASH & SLAG SUPPLYING SYSTEM

KOREA

2006,02

KOREA HI-MIX

SLAG CEMENT SUPPLYING SYSTEM

KOREA

2006,02

HI-MIX

SLAG CEMENT SUPPLYING SYSTEM

KOREA

2006,03

JEEGU REMICON

B/PLANT 210§©/HR(S/TOWER)-1 UNIT
TYPE : TWIN S/F (HSM-30RPM)
-SILO : 500TON-2,300TON-1 UNIT
-AGG' & SAND STOCK SYSTEM

KOREA

2006,03

HYUNDAI INDUSTRY

B/PLANT UPGRADE

KOREA

2006,03

DONGJIN INDUSTRY

CEMENT SILO & SUPPLYING SYSTEM

KOREA

2006,03

EUGENES REMICON

HIGH POWER TWIN MIXER EXCHANGE

KOREA

2006,03

SINIL-CM

SUPER CON & CONCELL SUPPLYING SYSTEM

KOREA

2006,03

DAEWOO YEMEN

B/PLANT MIXER GROUP(120§©/HR)
- SILO 400 TON 2 UNIT
- WATER CHILLER 120RT
- CEMENT UNLODING SYSTEM

YEMEN

2006,05

HANJIN HEAVY INDUSTRY

B/PLANT MIXER GROUP(210§©/HR)
-HI-SPEED MIXER(TWIN)
-SILO 200TON 2 UNIT
-WATER CHILLER 120RT
-WATER TANK 30,000L 2SET

PHILIPPINES

2006,05

CHUNMA CONCRETE

-4 KINDS OF CEMENT SUPPLYING SYSTEM

KOREA

2006,05

EUGENES REMICON

C2 150TON SILO

KOREA

2006,06

HANSUNG REMICON

AGG' & SAND CONVEYING SYSTEM

KOREA

2006,06

HYUNDAE INDUSTRY

WATER CHILLER 100RT

KOREA

2006,07

CHUNMA CONCRETE

WATER CHILLER 150RT

KOREA

2006,08

EUGENES REMICON

B/PLANT & WASTE REMICON RECOVERY SYSTEM

KOREA

2006,10

SINIL-CM

B/PLANT & WASTE REMICON RECOVERY SYSTEM

KOREA

2006,12

KOREA EXPRESSWAY CO.

-DEVICE PROVISIONAL DEVICES AND
SPREAD REMOVING FINE AGGREGATE
AND SURFACE MOISTURE

KOREA

2007,01

EUGENES REMICON

-150 TON/HR CRUSHING PLANT MOVEMENT. INSTALLATION.

KOREA

2007,02

SSANGYONG REMICON

-B/P PERFORMANCE IMPROVEMENT CONSTRUCTION

KOREA

2007,02

SSANGYONG REMICON

-MIXER AND CONTROL PANEL REPLACEMENT CONSTRUCTION

KOREA

2007,04

G.S E&C

NT BUILD TESTING MACHINE DELIVERY

KOREA

2007,04

EUGENES REMICON

-4 KINDS OF CEMENT 100TON SILO SUPPLY DEVICE CONSTRUCTIONS

KOREA

2007,05

SUNIL INDUSTRY

-B/PLANT EQUIPMENT PERFORMANCE IMPROVEMENT CONSTRUCTION

KOREA

2007,06

EUGENES REMICON

- B/PLANT 210§©/HR 2SET
- SILO 500 TON 2SET
- WASTE REMICON RECOVERY SYSTEM

KOREA

2007,07

TONG YANG MAJOR

B/PLANT EQUIPMENT RATIONALIZATION MECHANIC LIVES

KOREA

2007,09

KOREA CEMENY

C/M ASH SILO CONSTRUCTION

KOREA

2007,11

REXCON

HIGH POWER TWIN MIXER EXCHANGE

KOREA

2007,12

SAMPYO E&C

COMBINATION DEVICE RE-CHARGE

KOREA

2008,01

KOREA CEMENT

SLAG RATION INPUT EQUIPMENT

KOREA

2008,01

DAEWOO

- B/PLANT 120§©/HR 2SET
- SILO 400TON 2SET
- WATER CHILLER 1SET

LIBYA MISURATA

2008,01

DAEWOO

- B/PLANT 120§©/HR 1SET
- SILO 400TON 1SET
- WATER CHILLER 1SET

LIBYA BENGHAZI

2008,02

DAEWOO

- B/PLANT 120§©/HR 2SET
- SILO 400TON 2SET
- WATER CHILLER 1SET

LIBYA TRIPOIL

2008,02

EUGENES REMICON

- B/PLANT 210§©/HR 2SET
- SILO 300 TON
- WASTE REMICON RECOVERY SYSTEM

KOREA

2008,03

TONG YANG MAJOR

B/PLANT CONSTRUCTION

KOREA

2008,04

REXCON

HIGH POWER TWIN MIXER EXCHANGE

KOREA

2008,04

JISAN J E&C

- PORTABLE B/PLANT
- SILO 50 TON 2UNIT

NORTH KOREA

2008,05

DAEWOO

- B/PLANT 180§©/HR 2SET
- SILO 1400TON 3SET
- WATER CHILLER 1SET
- ICE PLANT 75 TON/DAY 2SET

OMAN REPAIR SHIPYARD

2008,07

TONG YANG MAJOR

B/PLANT CONSTRUCTION

KOREA

2008,08

TONG YANG MAJOR

AGGREGATE HOPPER INCREASE CONSTRUCTION.

KOREA

2008,09

TONG YANG MAJOR

FILE FACTORY B/PLANT IMPROVEMENT CONSTRUCTION.(120§©/HR)

KOREA

2008,11

KOREA EXPRESSWAY CO.

CURING WATER TANK IMPROVEMENTS
AND WATER TOTAL MANUFACTURE INSTALLATION.

KOREA

2008,12

DAEWOO

- B/PLANT 120§©/Hr-1SET
- SILO 400Ton-1SET

ALGERIA BOUGHEZOUL PJ' '

2008,12

GLOBAL TECH

SCREENS AND CONVEYOR INSTALLATION

KOREA

2009,02

NUGC

-B/PLANT 120§©/hr-1SET
-SILO 200TON-2SET, CHILLER

LIBYA TRIPOIL

2009,02

SINIL-CM

-LOW HEAT CEMENT SILO 300TON

KOREA

2009,02

CHUNG CHEONG UNIVERSITY

60§©/HR MANUFACTURE FOR STUDY PROVISIONAL B/P AND INSTALLATION.

KOREA

2009,02

REXCON

-HIGH POWER TWIN MIXER EXCHANGE

KOREA

2009,02

SAMSUNG INDUSTRY

-HIGH POWER TWIN MIXER EXCHANGE

KOREA

2009,03

EUGENES REMICON

-ANHYDRITE INPUT EQUIPMENT CONSTRUCTION.

KOREA

2009,05

DAEWOO

-SILICA SILO CONSTRUCTION

OMAN REPAIR SHIPYARD

2009,06

TONG YANG MAJOR

-LOW HEAT CEMENT PRODUCTIVE
FACILITIES CONSTRUCTION.

KOREA

2009,08

DAEWOO

-FLY-ASH BAG CEMENT CONSTRUCTION

OMAN REPAIR SHIPYARD

2009,10

GEUM YEONG CONSTRUCTION

-MOBILE CONCRETE BATCH PLANT

KOREA

2009,10

SUNG WON

-B/PLANT & SILO 500TON MANUFACTURE INSTALLATION.

LIBYA TOBRUK

2009,10

KOREA EXPRESSWAY CO.

-SILO CONSTRUCTION PORTABLE MINERAL MIXTURE ASH.

KOREA

2009,11

TONG YANG MAJOR

INSTALLATION OF SPECIAL CEMENT PRODUCTION SILO

KOREA

2009,12

SAMPYO E&C

-PST SYSTEMS MIXING EQUIPMENT FILLER

KOREA

2010,01

HWACHANG INDUSTRY

-LOW HEAT CEMENT STORAGE BIN MANUFACTURE INSTALLATION

KOREA

2010,03

SUNIL INDUSTRY

-B/PLANT IMPROVEMENT CONSTRUCTION

KOREA

2010,04

GEUM YEONG CONSTRUCTION

-MOBILE BATCH PLANT ¥±

KOREA

2010,04

SSANGYONG REMICON

-SLAG SUPPLYING SYSTEM

KOREA

2010,05

REXCON

-LOW HEAT CEMENT SILO

KOREA